Skip to content
SLx Series Documentation
Toggle navigation menu
⌘
K
SLx Series Documentation
/
3.
Installation
3.
Installation
3.1. Inspection
3.2. Rack Installation
3.2.1. Cooling Requirements
3.3. AC Input Connection
3.3.1. Ground Verification
3.3.2. AC Input Verification
3.3.3. Fuse Rating
3.4. DC Output Connection
3.4.1. Grounding the DC Output
3.5. Water Cooling
3.5.1. Solenoid Operation
3.5.2. Cooling System Types
3.5.3. Water Quality and Treatment
3.5.4. Preventive Measures and Maintenance
3.5.5. Pressure Monitoring
3.5.6. Preparing for Shipping or Storage
3.5.7. Cleaning the Water Path
3.6. Remote Sense Connection
3.7. External User I/O Connection
3.8. Computer Connection
3.8.1. USB Interface
3.8.2. RS485 Interface
3.8.3. Ethernet Interface
3.9. Electrical Check
3.10. Electrical Checkout Procedure
2.5. Principle of Operation
3.1. Inspection
Back to top